This project involved the construction of a brand-new Automatic Testing Equipment facility. The facility would operate 24/7 within an existing industrial compound at the site.

Office

Sector

Labs

Client

Ministry of Defence

Size

N/A

Approach

The main elements of our works included the erection of a new steel frame structure within an existing building to enable us to form the new ATE Facility utilising a Kingspan Quadcore KS 1100 Temperature Controlled System.

The project required careful design and planning throughout to ensure the pod was constructed between the valley gutters to reduce the possibility of water ingress and damage. Anti-static vinyl floor coverings were also installed, and we also constructed an M&E plant compound to specifically supply the ATE Facility with Fresh Air and Temperature Controlled Cooling.

Security of the site was also a fundamental consideration, and we constructed a perimeter security fence with a single point of access to ensure maximum confidence.

TMT provided a full M&E installation including AC vent, Power, Data and lighting in accordance with the performance specification.

4 Sealand _MG_1549-Edit-3
9 Sealand 3Z7A1432-Edit

The Impact it’s made

We completed this high-profile Lab project on time and in accordance with the agreed guidelines. We have developed a strong working relationship with our clients the Ministry of Defence throughout this project.

9 Sealand 3Z7A1432-Edit
9 Sealand 3Z7A1432-Edit
9 Sealand 3Z7A1432-Edit
9 Sealand 3Z7A1432-Edit
9 Sealand 3Z7A1432-Edit

Let‘s Talk

I‘m James, the labs sector specialist at TMT and would love to hear about your next project.
Get in touch
James Cordingley - Director plus icon
James