OFFICE REFURBISHMENT, ST GEORGES COURT ALTRINCHAM

The construction works to the unoccupied office had to be carried out to a very high standard to ensure a new tenant could be found to occupy the building as quickly as possible. TMT were instructed to carry out strip out works, making good and fit out works including a full redecoration scheme to two floors.

Works carried out included:

  • Design of installation of new M&E Services including air conditioning
  • New LED Lighting
  • New suspended ceiling
  • New carpets
  • Full decorations
  • External Repairs

CLIENT

Paragon C/O Pension Fund

Date

January 2016

Sector

Office

Value

Approx. £ 180k

An exceptional job undertaken by an exceptional contractor. From the moment we engaged with TMT they were on hand assisting with the design work and drawings, carrying this through to site where the standard of work and finish was second to non. By the time they had finished on site the building was transformed.

Simon Long

Associate Director, Paragon