Warehouse Extension, Blockfoil, Chadderton Industrial Estate, Manchester

The brief was to construct a new portal frame warehouse extension, to the side of a fully operational manufacturing premises, without creating dust, or interfering with the clients operations

TMT were instructed to carry out the construction works including;

  • Installation of pile foundation and a reinforced ground beam
  • Construction of a steel portal frame
  • Wall and Roof cladding to meet current U Values
  • Brickwork to match the existing
  • Reinforced floor slab to take machine loadings
  • Full decoration scheme internally
  • M&E Installations
  • Installation of a new reinforced concrete machine base
  • General External Repairs

CLIENT

Blockfoil C/O Colliers

Date

September 2016

Sector

Industrial / Manufacturing

We needed to keep producing our product, dust was a major issue for us so having contractors on site was a real concern, TMT managed the project very well and did everything we expected from a professional construction company, the site management team were always on hand, communication was
WAREHOUSE EXTENSION, BLOCKFOIL, CHADDERTON INDUSTRIAL ESTATE, MANCHESTER good and over all it was an enjoyable experience for all.

Paul Makin

Production Manager, Blockfoil

Subsequent to a lengthy tender analysis TMT were selected as the main contractor to undertake the works, we were impressed with the enthusiasm and skill in which they handled the project, the scheme was not without its risk in terms of dust creation and ensuring no detrimental effect on the clients operations, during our inspections each week we found a site that was very well managed, a good team of contractors involved and a well planned and executed construction project.

Simon Long

Associate Director, Colliers International